Sunday, 30 November 2014

Editing progress - part 3

Reflection on rough cut review

We got very high reviews from our class as seen in the video. Only a few shots were out sync. We filmed the ending already so it just needs to be all put together to finish off the video. Blogs are going good, next up is creating some interviews with the artists and then developing a digipack we should be up to date on everything.

Quick update

Just a page I was working on with the first part of the draft and some behind the scenes photos of the me. With how far we are with editing.
Site

Production: Skills development

View Skill development.pptx and other presentations by thaomyle.

Saturday, 29 November 2014

Mood board for Le blake

Music video teaser research

Looking into Youtube tutorials for editing

Social Media

We also have Facebook, Tumblr, Twitter, youtube... We have sportify! to keep in touch with our target audience. 
Youtube - Created with Haiku Deck, presentation software that inspires

Production: Improvements needed before final deadline

Interviewing the artist:Thaomy

Friday, 28 November 2014

Initial idea being changed

Blog Review: Problems

One of the hardest things I have found in A2 is managing my time with the blog work. To me, the coursework is structured more differently than AS as we started it from December  and finished it in March. Consequently, I had a lot of time to regularly update my blog as I did not have a lot of work to do that was non-media related.

However, now that I am in A2, rather than uploading posts consistently, I have a lot of huge time gaps in between the posts I upload. Due to the current work I am doing outside of college, I have not been able to spend a lot of time at home or outside media lessons to do my blog work. However, after receiving advice yesterday (27/11/2014) from one of the media staff, I have realised it is better to upload and record everything I do during lessons as the blog is marked through the level of detail and your time management.

Therefore, although I may sometimes lack detail in some of my blog post, I believe I can upload small things every now and then, allowing my blog to be updated on a consistent pace.


Thursday, 27 November 2014

Rough Cut Feedback Response

Overall, our feedback of our rough cut was positive, such as the violin scene, the framing and the focusing in and out of our shot. However, there was some small mistakes such as the lip syncing in the second verse as the female artist is out of sync and sings a bit too quickly. Also, we have very little shots of the violinist which is shown a bit in the intro of our music video and a minimum on the hook/anchor. We would address both these problems by:

  1. Correcting and perfecting the lip syncing on the second verse. Therefore, we may have to change the speed of some shots to match the lip syncing.
  2. Add more shots of the violinist in the end of our music video which were planning to do so as our narrative was structured this way.
  3. Also, I believe there is too much similar shot of the female artist in the second verse therefore I believe we should include some narrative to balance this out with the performance.


Rough Cut Feedback

Blog Update: Rough Cut Feedback Response

I decided to re-blog this as it originally was a written post and because the part of the blog work is marked on ICT skills, I wanted to present it through presentation, also I decided to tag it as group since I believe this is how we all addressed the issues rather than me.

Tuesday, 25 November 2014

Editing: Friday 14th November 2014 (Review)

Rough cut of the Music video

Sunday, 23 November 2014

Final notes about filming and editing

Filming the music video has gotten to the point were i have taken the song out of my playlist because I have heard it too many times. But it is still one of my top 80 songs. The filming process has been long but I have learnt a lot about filming such as how to always get the perfect shots when I film as not to waste film or a perfect shot. I found it easier to have more than enough camera recordings because when it comes to editing i need all the shots I can get.

Editing was difficult because I was not to a certain degree used to the final cut pro to be used on such a high level. I'm a perfectionist so the music video had to be good so therefore the editing had to be solid. The rough cut deadline is coming up and we have not a lot left to film i am feeling confident about the music video.

EDITING: Feedback 2

Production: Organizing film and Editing

Organisation is really vital in order to make the music video come alive therefore we message each other through Whatsapp to keep up to date to know what we are filming.

Notice

Some of my behind the scenes videos and images were not uploaded because I forgot I had filmed them. I have posted them all so now we should be more up to date.

Production : Reflection on Music video

Production: Post note and ideas for Evaluation 1


Bastille website analysis

http://nawdjunior123.wix.com/bastille <click it :D


Planning: Example Website design


Click on here to see an example website design for Le Blake:

Thursday, 20 November 2014

FILMING Day Three Review

FILMING: Day Two Review

(I realise this blog is uploaded a month after second first day of filming, however I spent most of the time collecting the footage and presenting it.)

Link for better layout: http://app.emaze.com/1196887/filming-day-two
Powered by emaze

FILMING: Day One Review

(I realise this blog is uploaded a month after our first day of filming, however I spent most of the time collecting the footage and presenting it.)

Tuesday, 18 November 2014

progress



Gallery is empty

Nawd Filming Day 5

Nawd here: Il speak on behalf of my group for this post. Filming on day 5 was very fun to be totally honest. Tahmina's fail was the highlight :D. We most of Thaomy's acting scenes done, most of mine with the mask also. The weather wasnt too bad but was still very cold.

Filming was very straightforward with Thaomy acting, me recording and Tahmina making sure the shots we took were perfect. Only issue was with us getting the background full of houses out of the shot because it would ruin the whole feel of what we were doing. (quiet close to a bunch of flats)

I developed a kind of check before I film kind of attitude as not to waste memory on the camera.(we take a lot of shots.)

So to summarise a very successful day, very cold and technical.

PRODUCTION: Filming on Day 5



Monday, 17 November 2014

Behind the scenes editing

Me editing and explaining what I was doing.

Editing progress


How Carol Vernallis' theory links to our video

How our video is linked to Ca...


More presentations from Chuck

Sunday, 16 November 2014

PRODUCTION: Behind the scenes: Day 3 and 4

Friday, 7 November 2014

Extra blog: extra planning

EDITING: Feedback

After editing our intro, we decided to get feedback from a different media teacher who does not know what our music video is about.


Post-Production: Introduction

Since we could not film, we started to edit the footage that we have which was quite long as we had to upload the footage on the video drive and constantly render whilst editing. Below is a video, of how we initially feel about media and our coursework after coming back from half term where we filmed 75% of our music video.


PLANNING: Overview

PLANNING: Progressive Blog


Wednesday, 5 November 2014

Progress Grade Response

Tuesday, 4 November 2014

PLANNING: Audience Research

http://tahminarahman1996.wix.com/audiencebastille
http://tahminarahman1996.wix.com/audiencebastille

PLANNING: Digipak Research

Progress grade response

PLANNING: Artist Website

Monday, 3 November 2014

Reaction to progress grade




So today was the dreaded progress grade day. Well im not upset about my grade but it wasn't what i expected.
 Im not sure if i can tell you what it was so i will just describe the grade. Its not the super amazing one or the second place but also amazing one its the one just slightly under which is still good but you should have done better.

At first i was like well looks like this year wont be so fun but luckily my teacher gave me tips on how to improve and hit the higher tier margins so its not all bad news.

One of the main issues was the time management between blogs. I explained it underneath this blog and will try from now on to maintain the blog to perfection in order to get the main grade i want.

I think i'm happy with the grade; id be lying if i said i didn't want to get full marks in everything.

So from here till the next blog review i will try to make as much progress as possible and  stay on-top of things.

Production: Organising Film Fail

Below is an email conversation to show that our group will not be attending one of the media lesson to edit as we had to film instead.
PRINT SCREEN OF EMAIL
Our group arranged to film on Monday 3rd of November, 9 to 12 in the morning. However, due to the heavy rain we were unable to film. 

Explanation of absent + update

After i did my pitch with my group there was a small amount  of lag time between my posts. This was mainly due to the filming and other work i needed to catch up with. "Fear not the work is done and will be posted soon".

So what was i doing the past 7 days you ask? 
Filming my music video of course. Being the main artist is a lot harder than i expected. Singing  a song more than 20 times fully is very tiring and time consuming. 

Filming during half term was more difficult than you would expect. The -1 hour of daylight saving you would have thought was a blessing but was just an indication that the hours light is out are way less. (this is media so i wont bore you with science) But if i have to.

Im bad at maths also so this means only around 6 hours of filming a day. (Don't judge me waking up at 11 is a must)

So between the 7 days 4 of these were used for filming; theres a lot of footage. 
Most of the information and reaction to filming will be posted on the next few days but i will say one thing. You can never have enough days of  filming. 

Will be covering how i felt about filming and what i did in those particular days in the next few days.